Tanner Electric Cooperative (TEC) has many annual filing requirements each year. The following information is required to be posted for public viewing:

Fuel Mix Disclosure

RCW 19.29A.060 requires TEC to disclose the types of fuel sources that were used in the generation of electricity. TEC is a full requirements customer of Bonneville Power Administration (BPA), meaning TEC does not generate any power and relies entirely on BPA to meet load requirements.

fuel mix

No Coal Attestation

WAC 194-40-300 requires TEC to attest by June 1, 2027, and each year thereafter, that the utility’s retail electric load in the prior calendar year did not include a coal-fired generated resource. The following link provides documentation of attestation:

TEC No Coal Attestation (under construction)

Energy Resource Plans

RCW 19.280.030 requires TEC to make public its Resource Plan. A utility with less than 25,000 members must create a Resource Plan that (a) estimates loads for the next five and ten years, (b) enumerates the resources that will be maintained and/or acquired to serve those loads, and (c) explains why the resources were chosen. As a full requirements customer of BPA, TEC is obligated to follow BPA’s fuel mix which is mostly from hydro. TEC’s Resource Plan is available through the link below: